Proven Delivery on Complex Projects
Cape Dunstans has delivered infrastructure projects across mining, utilities and civil sectors for major resource companies, utilities and infrastructure owners. Full write-ups for the projects below are still being finalised – two featured case studies are complete, with the remainder to follow as content is confirmed.
Featured case study: Newmont D6 Dam and Mine Infrastructure Project
Client: Newmont Gold Corporation. Location: Boddington Mine, Bannister WA. Cape Dunstans was engaged by Newmont Gold Corporation to deliver the D6 Dam and Mine Infrastructure Project at the Boddington mine, constructing a seven-gigalitre water storage facility and associated mine infrastructure. Project scope included five pumping stations with more than 15 pumps, electrical works, a 2,000m3 panel storage tank, civil works and bulk earthworks, and more than 30km of large-bore HDPE and MSCL pipelines up to DN800.
Featured case study: Mt Holland Water Pipeline Project
Client: Covalent Lithium. Location: Moorine Rock to Mt Holland, Western Australia. Cape Dunstans delivered a new 136km transfer pipeline from the Goldfields Water Pipeline tie-in at Moorine Rock to the Mt Holland Concentrator site, predominantly DN400 PN20 PE100 HDPE, including trenching, welding, backfilling, reinstatement, trenchless crossings and as-built surveying.
Mining Services – Crushing and Screening
- AngloGold Ashanti – Tropicana
- Newmont – Boddington Crushing / Modular
- Talison Minerals – Greenbushes
HDD
- University of Queensland – Herron Island Research Station (seawater intake)
- Fortescue Metals Group – Dewatering
- Rio Tinto Iron Ore – Marandoo (dewatering)
- John Holland (for Gold Coast City Council) – Nerang River (conventional)
Underground Utilities
- Water Corporation – Pipeline Renewal
- Western Power – Underground Power, Cable Installation, Undergrounding Network, Underground Cable Sections
- ATCO Gas – Pipeline Construction
- NRW – Piping and Electrical Packages
- Centurion – Infrastructure Delivery